During periods of new building, construction and refit there is often a requirement for specific areas to be screened off, allowing work to proceed whilst minimising disruption to other locations. Currently used in Naval, commercial shipbuilding, commercial refit, offshore and construction markets, Scaffold cover guard® is able to contain shot blasting debris, paint over-spray and contamination from exterior environments.

Approvals and Testing
Scaffold cover guard® is:
- Approved by Lloyds Register of Shipping
- Recommended by Ministry of Defence DNES
- Recognised by Maritime and Costguard Agency (MCA)
|
Selected samples from the cover guard® range have been subjected to a series of tests utilising the test methodology contained in LPS 1207 Issue 2:2004 by BRE. The test report does not imply approval or certification and the test results only relate to the items tested and not necessarily to the product brought to market. Satisfies: Small flame test to BS 476 Part 12 1991 |
WARRES Nos. 300784 300800 300805 300809 15/02/00 |
| Warrington Fire Research IMO Resolution A.471 (XII) as amended by resolution A652 (14) |
WARRES No. 302363 05/07/01 |
| Warington Fire Research FAR Part 25: Appendix F, Part 4 "Vertical Test" |
WARRES 302412 23/07/01 |